18 February 2027
Battery passport and the QR code
Article 77: from this date, each LMT battery, each industrial battery over 2 kWh, and each electric-vehicle battery placed on the market or put into service must have a battery passport. Article 13(6): from the same date, all batteries are marked with a QR code.
- Date
- Status
- Ahead · in 87 days
- Last reviewed
- 22 November 2026
Source
We quote the document and link it. Read the source before you rely on a date. Reference information, not legal advice.
Embed this countdown
Free for any site or intranet. Paste this where you want the clock.
<iframe src="https://dppclock.com/embed/battery-passport-and-the-qr-code" title="Battery passport and the QR code countdown" width="420" height="190" loading="lazy" style="border:0;max-width:100%"></iframe> <p><a href="https://dppclock.com/deadlines/battery-passport-and-the-qr-code">Battery passport and the QR code: countdown by Battery Passport Clock</a></p>
Deadline alerts
Get an email before each Battery Passport Clock date moves or lands.
One short note when a date is 90, 30 and 7 days out, or when a source document changes. No list software is connected yet, so the form opens an email to us and we add you by hand.
Opens your email app. Nothing is stored on this site. Privacy